Contact-us

Home Demolition

filetPrintfilet Sharefilet

 

demolition

Partial demolition, deconstruction, safety procedures and complete replacement

MCC2I carries out any type of chimney demolition work:

  • Partial demolition following a process modernisation programme or to reduce the visual impact. Our design office handles the work involved in checking the engineering calculations.
  • Deconstruction of structures in sensitive environments or working plants.
  • Securing then demolishing structures presenting an imminent danger.
  • Demolition work within the context of the complete replacement of a metal chimney to make sure the work complies with standards (access, measurements, acoustics, safety, lifespan etc.).

Mcc2i draws on the unique expertise of its parent company, Beirens: design, production and installation of welded industrial chimneys, flues, silencers and sound absorbers for vibration solutions to comply with the EN 13084 standard and CE marking requirements.

All of this work is carried out to the highest professional standards, with the greatest respect for safety and the environment.

demolition
flue substitution

 

Our last testimonials

MCC2I worldwide

 

  • reference 1
  • reference 2
  • reference 3
  • reference 4
  • reference 5
  • reference 6
  • reference 7
  • reference 8
  • reference 9
  • reference 10
  • reference 11
  • reference 12

Access:Z.I. Saint-Ulfrant
rue Gustave Eiffel
27500 Pont-Audemer - France

Tel. +33(0)2 32 42 70 41
Fax +33(0)2 32 42 72 51

Contact-us

*All fields are required