The issue
The fixed ladders and platforms were out-of-use because of corrosion.
MCC2I's solution
MCC2I designed, produced and installed ladders with staggered runs and platforms to comply with NFE 85-016 and ISO 14122-4. All of our ladders and platforms can adapt to your existing facilities.
The issue
The chimney had not been surveyed for 5 years.
MCC2I's solution
MCC2I carried out an internal and external inspection of the chimney, checked the equipment and submitted a report with its recommendations. A preventative maintenance schedule has been planned.
The issue
The last 15 metres were covered in soot, which had worn away the daytime markings.
MCC2I's solution
MCC2I carried out the external cleaning of the load-bearing shaft before applying several layers of protective paint to the highest standards.
The issue
Following on from DREAL's comments, we realised new measurements needed to be added.
MCC2I's solution
MCC2I sized up, designed and installed the necessary reinforcements, then created some openings in the concrete shaft so the collection containers could be installed.
The issue
The three rows of bricks at the top of the chimney were out of use.
MCC2I's solution
MCC2I introduced specific internal access routes so work could be carried out in total safety. All of the bricks and seals over around 18m were replaced.
The issue
The plant was being converted so it could use natural gas rather than heating fuel.
MCC2I's solution
MCC2I carried out the piping work, which involved installing a metal pipe in the chimney so that the bricks were no longer in contact with the smoke.